top of page
projects
Overhead Crane Installation
Challenge: minimal headroom; modified hoist to run in-between bridge rails.
1/1
weigh-bridge
installation
Challenge: getting it level on uneven concrete.
Screen Shot 2017-12-06 at 3.08.31 PM
Screen Shot 2017-12-06 at 3.08.45 PM
Screen Shot 2017-12-06 at 3.08.37 PM
automation
400hp Drive lifted to next floor
VFD Control Panel
400hp Drives Installed
bottom of page