Overhead Crane Installation
Challenge: minimal headroom; modified hoist to run in-between bridge rails.




1/1
weigh-bridge
installation
Challenge: getting it level on uneven concrete.

Screen Shot 2017-12-06 at 3.08.31 PM

Screen Shot 2017-12-06 at 3.08.45 PM

Screen Shot 2017-12-06 at 3.08.37 PM
PLant
automation
Challenge: moving new panels to higher floor.

400hp Drive lifted to next floor


VFD Control Panel

400hp Drives Installed