Overhead Crane Installation

Challenge: minimal headroom; modified hoist to run in-between bridge rails.

R&M Spacemaster Hoist
press to zoom
New control panel with festoon cable
press to zoom
Installing the hoist
press to zoom
Installing the hoist
press to zoom
1/1

weigh-bridge

installation

Challenge: getting it level on uneven concrete.

Screen Shot 2017-12-06 at 3.08.31 PM
Screen Shot 2017-12-06 at 3.08.31 PM
press to zoom
Screen Shot 2017-12-06 at 3.08.45 PM
Screen Shot 2017-12-06 at 3.08.45 PM
press to zoom
Screen Shot 2017-12-06 at 3.08.37 PM
Screen Shot 2017-12-06 at 3.08.37 PM
press to zoom

PLant

automation

Challenge: moving new panels to higher floor.

400hp Drive lifted to next floor
400hp Drive lifted to next floor
press to zoom
press to zoom
VFD Control Panel
VFD Control Panel
press to zoom
400hp Drives Installed
400hp Drives Installed